Build inspection-ready rough-in packets in minutes

Photos, tests, and checklists in one place. Generate a consistent rough-in packet for every unit.

Packet Ready interface

The documentation bottleneck

Commercial plumbing contractors complete 90% of work in the field, then lose hours assembling inspection packets manually. Here's what makes this process so painful.

Unstructured multi-unit workflows
Unstructured multi-unit workflows
Projects with 20+ identical units require systematic evidence tracking. Traditional tools treat photos as flat lists, making it difficult to manage unit-specific documentation.
Fragmented test documentation
Fragmented test documentation
Pressure test results scattered across notes apps and spreadsheets create compliance risks. Without standardized templates and input validation, critical values can be lost or recorded incorrectly.
Missing required evidence
Missing required evidence
Strict jurisdictions mandate specific documentation at each stage. A single missing photograph delays approval, and tracking requirements across multiple units becomes overwhelming.
Siloed communication tools
Siloed communication tools
Critical project data fragmented across Excel, camera rolls, and messaging platforms creates information loss. Teams waste hours searching for the right photos or test results when inspection deadlines approach.
Manual packet assembly
Manual packet assembly
After completing 90% of work in the field, contractors lose hours stitching Excel spreadsheets and photos into PDFs. Each inspection requires recreating the same document structure from scratch.
No completion tracking
No completion tracking
Without real-time visibility into project progress, it's impossible to know which units are ready for inspection. Last-minute discoveries of missing documentation cause costly delays and rescheduling.

Deploy faster

Field-to-packet workflow

Enterprise-grade capture system designed for challenging field conditions. Purpose-built for commercial plumbing contractors managing multi-family projects.

Project initialization.
Establish project structure with comprehensive metadata: address, permit numbers, AHJ requirements, applicable code (IPC/UPC), inspection stage, and unit/area definitions.
Evidence capture.
Document installations with automatic categorization and timestamps. All media linked to project hierarchy with metadata preservation for audit requirements.
Automated packet generation.
Single-action generation of complete inspection packages: cover page, indexed unit sections, test documentation, required evidence, and checklist validation summary.
Packet Ready

Create Project

Minimal job setup for rough-in workflow

Step 1 of 3Job header

Everything you need

Enterprise capabilities

Every feature engineered for delivering inspection-ready documentation packages with complete audit trails and compliance tracking.

Packet ReadyOnline
Riverside Apartments - Building AUPC · Rough-In
Total Units
8
Ready
2
Failed Tests
1
Photos
65
Filter:

Unit 101

✓ Ready
12Photos
PASSTest
100%
100%Done

Updated 2h ago

Unit 102

8Photos
PASSTest
85%
85%Done

Updated 3h ago

Unit 103

In Progress
6Photos
Test
60%
60%Done

Updated 5h ago

Unit 104

⚠ Failed
10Photos
FAILTest
45%
45%Done

Updated 1d ago

Unit 105

In Progress
4Photos
Test
30%
30%Done

Updated 1d ago

Unit 106

✓ Ready
14Photos
PASSTest
100%
100%Done

Updated 2d ago

Unit 201

9Photos
PASSTest
90%
90%Done

Updated 2d ago

Unit 202

In Progress
2Photos
Test
15%
15%Done

Updated 3d ago

Multi-unit evidence management
Hierarchical organization with completion tracking. Purpose-built for repetitive multi-family workflows.
Structured test protocols
Standardized documentation templates ensuring compliance with inspection requirements.
Mandatory evidence validation
Pre-submission verification ensuring all required documentation is captured.
Automated package assembly
Standardized output format with comprehensive indexing and secure distribution.
Complete audit trail
Comprehensive metadata tracking for all evidence with timestamp preservation and activity attribution.
Offline-first architecture
Field-hardened system designed for intermittent connectivity with background sync queuing.

Frequently Asked Questions

Have a different question and can't find the answer you're looking for? Reach out to our support team by booking a free call and we'll get back to you as soon as we can.

Ready to streamline your rough-in documentation?

Stop wasting time assembling packets from scattered photos and notes. Start creating inspection-ready documentation in minutes, not hours.